Четверг, 21.11.2024, 09:41
Rush For English
Приветствую Вас Гость | RSS
Block title
Статистика

Онлайн всего: 1
Гостей: 1
Пользователей: 0
Форма входа
BELGRADE HOTEL - MOSCOW
ROOM PROGRAMSIGMA ARCHITECTURE AND INTERIORS20/12/2010


SUMMARY OF FLOOR AREAS


TOTAL GUESTROOMS376Total m2

100GUESTROOMS 17,447
200PUBLIC AREAS 1,648
300FUNCTION/MEETING ROOMS 1,210
400ADMINISTRATIVE AREA 257
500SERVICE AREAS 1,365
600HEALTH CLUB 433
700MECHANICAL AREAS 940
800Circulation and Structure in Public and BOH areas 2,435
900PARKING 846

GROSS INTERNAL AREA (excluding parking) 25,735 13474

AVERAGE AREA PER GUESTROOM = 68 m23004

USES AND FLOOR AREAS

ACCOMMODATION m2Totals m2

100GUESTROOM FLOORS
Modules m2
101 Guestrooms57x24 1,368
102 Guestrooms57x25 1,425
103 Guestrooms104x27 2,808
104 Guestrooms89x28 2,492
105 Guestrooms16x31 496
106 Guestrooms47x33 1,551
107Suite3 (2 modules)x49 147
108Suite3 (2 modules)x56 168
109Circulation and Structure 6,992

Sub Total 17,44710,470

200PUBLIC AREAS m2
201 Entrance Lobby and Reception 400
202 Level 1 Restaurant including Show Kitchen and Buffet 550
203 Level 1 Bar 185
204 Level 1 Café/Patisserie 180
205 Level 19 Bar including Store 238
206 Level 1 Public Toilets and Cloaks 50
207 Level 2 Public Toilets 45

Sub Total 1,648

300FUNCTION / MEETING ROOMS m2
301Meeting RoomsNumberPeoplem2 m2
302 11536 36
303 32048 144
30422050 100
305 32053 159
306 12558 58
307 12565 65
308 13070 70
309 13075 75

310Total Meeting Rooms13 707 707

311Business Centre 37
312Meeting Rooms Breakout Area 1 190
313Meeting Rooms Breakout Area 2 104
314Meeting Room Pantry 62
315Meeting Room Store 40
316Meeting Room Toilets 70

Sub Total 1,210

400ADMINISTRATIVE AREA m2
401Front Office 35
402Administration & Accounts 222

Sub Total 257

500SERVICE AREAS m2
501Main Kitchen, F&B Stores and Kitchen Staff Toilets and Lockers 400
502Café/Patisserie Kitchen 60
503Bar Store 20
504General Store 97
505Housekeeping/Laundry 200
506Staff Lockers 120
507Staff Cafeteria 100
508Training/Learning Zone 28
509Human Resources 32
510Engineering 205
511Receiving/Security 25
512Refuse /Empties 66
513Baggage 12

Sub Total 1,365

600HEALTH CLUB/SPA 433

Sub Total 433


700MECHANICAL AREAS
701Plantrooms, Cold Water Storage, Pool Filtration, UPS, Gas Meter Room, Generator, Switchroom, Electricity Utility Room 940

Sub Total 940

800Circulation and Structure in Public and BOH areas 4,919

Sub Total 4,919

900Parking (24xspaces) 846

Sub Total 846

These areas and schedule are approximate at this stage and are subject to requirements by planning and all statutory bodies, structural and M&E design development.
Any decision to be made on this basis of these predictions, whether as to project viability, pre-letting, lease agreements or the like should include due allowance for increases and decreases inherent in the planning and design development and building process.







Поиск
Knopki
oblako tegov
Beguchaya stroka
Copyright MyCorp © 2024Создать бесплатный сайт с uCoz